Quiz 5 – Process Control and Sustenance
What is the primary purpose of Statistical Process Control (SPC)?
*
To eliminate all variation from a process
To distinguish normal process variation from unusual variation and monitor stability
To replace process capability analysis
To determine customer specifications from historical data
Which statement correctly distinguishes control limits from specification limits?
*
Control limits are customer requirements; specification limits are calculated from process data
Both limits are calculated from the same historical process data
Control limits describe statistical process behavior; specification limits describe required performance
Specification limits are used only when a process is unstable
A process records one continuous measurement at a time, with no rational subgroups. Which control chart is generally appropriate?
*
Xbar-R
Xbar-S
I-MR
np
Five consecutive continuous measurements are collected as a rational subgroup each hour. Which chart is generally appropriate for small subgroups?
*
p chart
Xbar-R chart
u chart
I-MR chart
A company inspects a varying number of units each day and records the proportion that is defective. Which attribute chart is appropriate?
*
np chart
c chart
p chart
Xbar-R chart
What does an np chart monitor?
*
Number of defects per unit with varying opportunities
Number of defective units when sample size is constant
Process mean for continuous measurements
Moving range of individual measurements
Why is rational subgrouping important in SPC?
*
It guarantees that every point will fall inside the control limits
It helps separate short-term within-subgroup variation from variation between subgroups
It eliminates the need for measurement-system analysis
It makes specification limits unnecessary
A control chart shows one point beyond the upper control limit. What is the most appropriate initial response?
*
Immediately change the process setting without investigation
Ignore the point because it may still meet specifications
Investigate the process conditions and potential special cause
Recalculate the specification limits
Why should process stability generally be established before capability analysis?
*
Capability indices do not require process data
An unstable process may have changing mean or variation, making capability estimates misleading
Control charts can calculate customer specifications
Capability analysis automatically identifies all special causes
Which sequence best represents a practical Control Plan methodology?
*
Measure everything, then assign responsibility later
Identify critical characteristics, define requirements and measurement, set monitoring, assign responsibility, and establish a reaction plan
Create specification limits from the control chart and stop monitoring
Use final inspection only and avoid preventive controls
Which statement best describes a reaction plan?
*
A list of customer specifications only
A method for calculating Cp and Cpk
Defined actions to take when an abnormal or nonconforming condition is detected
A replacement for standard work
Which example is primarily a preventive control?
*
Final inspection of completed products
Weekly audit of completed transactions
An automated validation that prevents submission when a required field is missing
Review of customer complaints after delivery