Lean Tools – VSM, 5 S and Kanban

Learning Objectives

By the end of this lesson, the learner will be able to:

  • Explain the principles and objectives of Lean thinking.
  • Distinguish value-added from non-value-added activities.
  • Identify the eight commonly recognized forms of waste.
  • Explain the purpose of Value Stream Mapping (VSM).
  • Distinguish current-state and future-state maps.
  • Identify process flow, information flow, inventory, lead time, and cycle time on a value stream map.
  • Explain the principles and stages of 5S.
  • Apply 5S to organize and stabilize a workplace.
  • Explain the purpose of Kanban as a pull-based control mechanism.
  • Distinguish push systems from pull systems.
  • Understand WIP limits and visual replenishment signals.
  • Select appropriate Lean tools for different process problems.
  • Connect Lean tools with Six Sigma and DMAIC.
  • Apply VSM, 5S, and Kanban to improve flow, reduce waste, and sustain improvements.

1. Introduction

Six Sigma focuses strongly on reducing variation and defects.

Lean focuses strongly on improving flow, speed, efficiency, and customer value by eliminating waste.

When combined, Lean and Six Sigma provide a powerful process-improvement approach.

A simplified distinction is:

Lean:

Improve flow and eliminate waste.

Six Sigma:

Reduce variation and defects.

Lean Six Sigma:

Improve process performance by addressing both waste and variation.

Lean does not mean simply working faster.

The objective is to design and manage processes so that work flows smoothly toward customer value with minimum unnecessary activity.

Three important Lean tools covered in this lesson are:

  • Value Stream Mapping (VSM)
  • 5S
  • Kanban

Each addresses a different aspect of process improvement.


2. Concept / Theory

2.1 What Is Lean Thinking?

Lean thinking focuses on delivering customer value while systematically reducing activities that consume resources without creating that value.

A Lean improvement approach asks:

What does the customer actually value?

and:

Which activities are necessary to deliver that value, and which create avoidable waste?

Lean is therefore strongly connected to:

  • Customer value
  • Flow
  • Pull
  • Waste reduction
  • Continuous improvement
  • Respect for people
  • Standardized work

2.2 Value-Added and Non-Value-Added Activities

A useful starting point is to classify process activities.

Value-Added Activity

An activity is generally considered value-added when it:

  1. Changes the product, service, or information in a way the customer requires.
  2. Is performed correctly the first time.
  3. Contributes directly to the required customer outcome.

Examples may include:

  • Machining a component to the required specification.
  • Performing a required service activity.
  • Completing a customer-requested configuration.

Non-Value-Added Activity

An activity consumes resources but does not directly create customer value.

Examples:

  • Waiting
  • Excess movement
  • Unnecessary transportation
  • Rework
  • Excess inventory
  • Duplicate processing

Some non-value-added activities may nevertheless be currently necessary because of regulatory, contractual, safety, or operational requirements.

The objective is to identify and reduce unnecessary non-value-added work while protecting necessary controls.


2.3 The Eight Forms of Waste

Lean commonly identifies eight categories of waste.

1. Defects

Errors that require correction, rework, replacement, or additional processing.

Examples:

  • Incorrect product
  • Data-entry error
  • Rejected component
  • Incorrect invoice

2. Overproduction

Producing earlier, faster, or in greater quantity than required.

Examples:

  • Producing inventory before demand exists.
  • Preparing reports nobody needs.
  • Processing transactions ahead of actual demand.

3. Waiting

People, equipment, materials, or information waiting for the next step.

Examples:

  • Customer waiting for approval.
  • Machine waiting for material.
  • Employee waiting for authorization.

4. Non-Utilized Talent

Failing to use people’s knowledge, skills, creativity, and problem-solving capability.

Examples:

  • Employees not involved in improvement.
  • Skilled staff performing unnecessary administrative work.
  • Ideas from frontline employees being ignored.

5. Transportation

Unnecessary movement of materials, products, documents, or information.

Examples:

  • Moving materials between distant locations.
  • Physically transporting documents for routine approval.

6. Inventory

Excess materials, work-in-process, or finished goods beyond what is needed.

Examples:

  • Excess raw material
  • Large WIP queues
  • Excess finished inventory

7. Motion

Unnecessary movement by people.

Examples:

  • Walking repeatedly to retrieve tools.
  • Searching for documents.
  • Reaching or bending unnecessarily.

8. Extra-Processing

Performing more work than required.

Examples:

  • Duplicate data entry
  • Excessive inspection
  • Repeated approvals without value
  • Formatting information that does not affect the customer outcome

A useful memory sequence is:

Defects → Overproduction → Waiting → Non-Utilized Talent → Transportation → Inventory → Motion → Extra-Processing


2.4 Value Stream Mapping

Value Stream Mapping (VSM) is a visual method for representing the flow of materials, information, and activities through a process or value stream.

VSM helps the team see the process as a connected system rather than as isolated departments.

It can reveal:

  • Waiting
  • Inventory
  • Bottlenecks
  • Excess processing
  • Information delays
  • Long lead times
  • Uneven flow
  • Disconnects between demand and production

2.5 Current-State Map

A current-state map represents how the process operates today.

It should reflect the actual process rather than the intended process.

The team may document:

  • Process steps
  • Cycle times
  • Changeover times
  • WIP
  • Inventory
  • Waiting
  • Information flow
  • Production frequency
  • Customer demand
  • Supplier information
  • Process lead time

The current-state map establishes the baseline.


2.6 Future-State Map

A future-state map describes a proposed improved flow.

The objective is not simply to draw a prettier process.

The future-state map should address identified problems such as:

  • Excess WIP
  • Long queues
  • Poor flow
  • Unnecessary transport
  • Excess processing
  • Uncontrolled production
  • Information delays

The future state should be realistic and connected to an improvement implementation plan.


2.7 Lead Time vs Cycle Time

These terms are important in VSM.

Cycle Time

The time required to complete a process activity or unit of work.

Lead Time

The elapsed time from the beginning of the customer’s request or process flow to the completion of the required output, according to the defined process boundary.

A process may have a short cycle time but a very long lead time because of waiting between activities.

Example

Suppose:

  • Processing time = 30 minutes
  • Waiting = 3 days

The work may require only 30 minutes of actual processing but have a much longer overall lead time.

This is one reason Lean focuses heavily on flow and waiting.


3. Key Topics

3.1 VSM Components

A VSM commonly represents:

  • Customer
  • Supplier
  • Process steps
  • Material flow
  • Information flow
  • Inventory
  • WIP
  • Process data
  • Push/pull relationships
  • Lead time
  • Cycle time
  • Production or service demand
  • Control points

The exact symbols may vary by organization or mapping convention.

The important principle is that the map should help the team understand how work and information actually flow.


3.2 Takt Time

Takt time represents the available production time divided by customer demand over the corresponding period.

Conceptually:

Takt Time = Available Production Time ÷ Customer Demand

Example

Available production time:

420 minutes per day

Customer demand:

140 units per day

Therefore:

Takt Time = 420 ÷ 140 = 3 minutes per unit

This means the process needs to complete one unit approximately every three minutes to keep pace with demand, assuming the defined available-time and demand assumptions.

Takt time is a demand-based planning concept.

It should not be confused with actual cycle time.


3.3 Bottleneck

A bottleneck is a process constraint that limits overall flow or throughput.

Typical symptoms include:

  • Excessive queue before a process.
  • High utilization of the constrained resource.
  • Long waiting time.
  • Downstream starvation or upstream accumulation.

VSM can help identify potential bottlenecks.

However, the team should validate the suspected bottleneck using actual process data.


3.4 5S

5S is a workplace organization and visual-management methodology.

The five stages are commonly described as:

  1. Sort
  2. Set in Order
  3. Shine
  4. Standardize
  5. Sustain

3.5 Sort

Remove unnecessary items from the workplace.

Ask:

  • Is this item required?
  • How frequently is it used?
  • Does it belong here?
  • Is it obsolete?

Examples:

  • Remove obsolete documents.
  • Remove broken tools.
  • Remove unused materials.
  • Remove duplicate supplies.

3.6 Set in Order

Arrange necessary items so they are easy to locate, access, use, and return.

Examples:

  • Designated tool locations
  • Labels
  • Visual storage
  • Point-of-use supplies
  • Clearly identified document locations

The principle is:

A place for everything and everything in its place.


3.7 Shine

Clean and inspect the workplace.

Shine is not merely cosmetic cleaning.

Cleaning can reveal:

  • Leaks
  • Damage
  • Wear
  • Loose components
  • Abnormal conditions
  • Contamination

Therefore, Shine can support early detection of equipment and process problems.


3.8 Standardize

Develop consistent methods for maintaining the first three stages.

Examples:

  • Cleaning schedules
  • Visual standards
  • Checklists
  • Photographic standards
  • Workplace audits
  • Standard procedures

3.9 Sustain

Maintain the improved condition through:

  • Leadership support
  • Training
  • Audits
  • Ownership
  • Visual controls
  • Regular review
  • Continuous improvement

Sustain is often the most difficult stage because it requires disciplined behavior over time.


3.10 Kanban

Kanban is a visual, pull-based method for controlling the flow and replenishment of work or materials.

The fundamental concept is:

Downstream demand triggers upstream replenishment.

Rather than automatically producing according to a forecast or schedule alone, the process uses a signal to indicate that additional work or material is required.


3.11 Push vs Pull

Push System

Work is released based primarily on a plan, forecast, or schedule.

This can lead to:

  • Excess WIP
  • Overproduction
  • Queues
  • Inventory accumulation

Pull System

Work is triggered by actual downstream demand or consumption within the defined system.

Potential benefits include:

  • Reduced WIP
  • Better flow
  • Less overproduction
  • Improved visibility
  • Faster response to actual demand

Pull does not mean that forecasting becomes unnecessary.

Organizations may still use forecasts for capacity and resource planning.


3.12 Kanban Signals

A Kanban signal may be:

  • Physical card
  • Bin
  • Electronic signal
  • Barcode
  • Digital workflow notification

A Kanban system typically communicates:

  • What is needed
  • How much is needed
  • Where it is needed
  • When replenishment should occur

3.13 WIP Limits

Work-in-process limits restrict the amount of work allowed within a process or workflow.

WIP limits can help:

  • Reduce multitasking.
  • Prevent excessive queues.
  • Reveal bottlenecks.
  • Improve flow.
  • Encourage completion of existing work before starting additional work.

For example:

If a process has a WIP limit of 10 cases, the team should not simply add an 11th case without following the defined replenishment or exception rules.


4. Tools / Methodology

4.1 VSM Methodology

Step 1 — Define the Value Stream

Identify:

  • Product/service family
  • Customer
  • Process boundary

Step 2 — Observe the Actual Process

Go to the workplace or process and observe the real flow.

Do not rely entirely on procedures or assumptions.

Step 3 — Create the Current-State Map

Document:

  • Process steps
  • Cycle times
  • WIP
  • Waiting
  • Information flow
  • Lead time
  • Customer demand

Step 4 — Identify Waste

Look for:

  • Waiting
  • Defects
  • Inventory
  • Motion
  • Transportation
  • Overproduction
  • Extra-processing
  • Underutilized talent

Step 5 — Identify Constraints

Look for:

  • Bottlenecks
  • Capacity restrictions
  • Information delays
  • Quality problems
  • Unbalanced workloads

Step 6 — Develop Future State

Design a practical improved flow.

Step 7 — Create an Implementation Plan

Identify:

  • Actions
  • Owners
  • Dates
  • Resources
  • Measures

Step 8 — Monitor Results

Measure:

  • Lead time
  • WIP
  • Productivity
  • Quality
  • Flow
  • Customer performance

4.2 5S Methodology

A practical 5S implementation is:

Sort → Set in Order → Shine → Standardize → Sustain

For each stage:

Sort

Identify unnecessary items.

Set in Order

Organize necessary items.

Shine

Clean and inspect.

Standardize

Define the required condition.

Sustain

Audit, reinforce, and continuously improve.


4.3 Kanban Implementation

Step 1 — Define the Workflow

Understand the sequence of work.

Step 2 — Identify Demand

Determine the actual downstream requirement.

Step 3 — Establish WIP Limits

Define reasonable limits for each stage.

Step 4 — Define the Signal

Determine how replenishment is triggered.

Step 5 — Establish Replenishment Rules

Define:

  • Quantity
  • Trigger
  • Responsibility
  • Timing
  • Exception handling

Step 6 — Visualize the Process

Use:

  • Cards
  • Bins
  • Boards
  • Electronic signals

Step 7 — Monitor Flow

Measure:

  • WIP
  • Lead time
  • Throughput
  • Waiting
  • Stockouts
  • Replenishment performance

Step 8 — Improve

Adjust WIP limits and replenishment rules based on actual process performance.


4.4 Selecting the Right Lean Tool

ProblemPotential Lean Tool
Poor visibility of end-to-end flowVSM
Excessive waitingVSM / Flow improvement
Excessive WIPVSM / Kanban
Workplace disorganization5S
Searching for tools/materials5S
Excess inventoryVSM / Kanban
OverproductionPull / Kanban
Unnecessary movement5S / VSM
Poor workplace standards5S
Bottleneck or flow constraintVSM
Poor replenishment controlKanban

Tools should be selected according to the actual process problem.


5. Worked Example / Case Study

Case Study: Component Assembly Process

A manufacturing company produces a component used in a larger assembly.

The process consists of:

  1. Material issue
  2. Cutting
  3. Machining
  4. Inspection
  5. Assembly
  6. Final inspection
  7. Dispatch

The team observes the following:

  • Large WIP between machining and inspection.
  • Operators frequently search for tools.
  • Material is produced before downstream demand.
  • Final inspection identifies recurring defects.
  • Production information is primarily schedule-driven.

The team decides to apply VSM, 5S, and Kanban.


5.1 VSM Analysis

The team creates a current-state map.

They identify:

  • Long waiting time before inspection.
  • Excess WIP.
  • Imbalance between machining and inspection.
  • Information delays.
  • Production quantities larger than immediate downstream requirements.

The team then develops a future-state concept focused on:

  • Improved flow.
  • Reduced WIP.
  • Better synchronization.
  • Pull-based replenishment.

5.2 5S Application

The machining area is analyzed.

Sort

Obsolete tools and unused materials are removed.

Set in Order

Frequently used tools receive designated locations.

Shine

The area is cleaned and equipment condition is checked.

Standardize

Visual standards and cleaning responsibilities are defined.

Sustain

A periodic 5S audit is established.

The result is not merely a cleaner workplace.

The objective is to reduce searching, movement, delays, and abnormal conditions.


5.3 Kanban Application

The team establishes a controlled replenishment system between machining and assembly.

When downstream assembly consumes a defined quantity, a replenishment signal is generated.

The team establishes:

  • Standard container quantity
  • Number of Kanban signals
  • Replenishment trigger
  • Responsible personnel
  • Exception procedure

This limits uncontrolled WIP and makes replenishment visible.


5.4 Results to Monitor

The team monitors:

  • WIP
  • Lead time
  • Cycle time
  • Defect rate
  • Productivity
  • Tool-search time
  • Stockouts
  • On-time delivery

The Lean tools are therefore connected to measurable process outcomes.


6. Practical Application

Exercise 1 — Identify Waste

Observe a process and identify examples of:

  • Defects
  • Overproduction
  • Waiting
  • Non-utilized talent
  • Transportation
  • Inventory
  • Motion
  • Extra-processing

For each waste, document:

  1. Where it occurs.
  2. What causes it.
  3. What impact it has.
  4. What evidence demonstrates the impact.
  5. Potential improvement.

Exercise 2 — Create a Current-State VSM

Select a process.

Document:

  • Customer demand
  • Process sequence
  • Cycle time
  • Waiting time
  • WIP
  • Inventory
  • Information flow
  • Lead time
  • Bottlenecks
  • Major waste

Calculate the total lead time and compare it with actual value-added processing time where the measurements are defined consistently.


Exercise 3 — 5S Workplace Assessment

Select a workplace.

Evaluate:

Sort

What is unnecessary?

Set in Order

Where should necessary items be located?

Shine

What abnormalities can cleaning reveal?

Standardize

What standard condition should be maintained?

Sustain

How will compliance be monitored?


Exercise 4 — Kanban Design

For a process with recurring material demand, define:

  • Demand rate
  • Replenishment quantity
  • Container size
  • Number of Kanban signals
  • Replenishment trigger
  • Responsible person
  • WIP limit
  • Exception procedure

The system should be validated against actual demand, replenishment time, and process constraints.


6.1 Lean Improvement Checklist

Before implementing a Lean improvement, verify:

  • Customer value is defined.
  • Actual process flow has been observed.
  • Current-state conditions are documented.
  • Waste has been identified.
  • Data support the problem definition.
  • Bottlenecks have been considered.
  • VSM is based on actual process conditions.
  • 5S requirements are clearly defined where applicable.
  • WIP is measured.
  • Pull opportunities have been considered.
  • Kanban rules are clearly defined where applicable.
  • Responsibilities are assigned.
  • Performance measures are defined.
  • Improvements are validated.
  • Standard work is updated.
  • Control mechanisms are established.
  • Sustainment responsibilities are assigned.

7. Lesson Summary

Lean tools help organizations improve flow and reduce waste.

The key principles are:

  • Lean focuses on customer value and flow.
  • Waste consumes resources without creating corresponding customer value.
  • Eight commonly recognized wastes are defects, overproduction, waiting, non-utilized talent, transportation, inventory, motion, and extra-processing.
  • VSM provides an end-to-end view of material and information flow.
  • Current-state mapping establishes how the process actually operates.
  • Future-state mapping describes a proposed improved flow.
  • Lead time can be much longer than actual processing time because of waiting.
  • Takt time connects available production time with customer demand.
  • 5S improves workplace organization, visual management, and process discipline.
  • Sort removes unnecessary items.
  • Set in Order organizes necessary items.
  • Shine cleans and exposes abnormalities.
  • Standardize defines the desired condition.
  • Sustain maintains the improved condition.
  • Kanban supports pull-based replenishment.
  • WIP limits help control the amount of work in process.
  • Lean tools should be selected according to the actual process problem.
  • Lean and Six Sigma can complement each other by addressing waste, flow, variation, and defects.

A useful Lean improvement sequence is:

Observe → Map → Identify Waste → Improve Flow → Standardize → Monitor → Sustain


8. Lesson Learnt / Conclusion

Lean improvement begins with understanding what the customer values and then examining how work actually flows through the process.

The Green Belt should not assume that the largest department, the busiest employee, or the most visible problem is necessarily the primary constraint.

Instead, the Green Belt should:

  • Observe the process.
  • Collect relevant data.
  • Map the value stream.
  • Identify waste.
  • Understand constraints.
  • Improve flow.
  • Establish appropriate controls.
  • Sustain the improvement.

VSM helps the Green Belt understand the whole value stream.

5S helps establish an organized and visually controlled work environment.

Kanban helps regulate flow and replenishment according to demand.

These tools become more powerful when they are connected to measurable Six Sigma objectives.

The ultimate goal is not simply:

“Use Lean tools.”

The goal is:

Create a process that delivers customer value with less waste, better flow, controlled variation, and sustainable performance.

Key takeaway:

See the whole flow, remove unnecessary work, establish disciplined processes, and make improvement sustainable.