Skip to main content
Skip to course navigation
Return to course: Lean Six Sigma – Green Belt Programme
Previous Lesson
Previous
Next
Next Section
Quiz 6 – Root Cause and Lea Improvement
What is the primary purpose of Root Cause Analysis (RCA)?
*
To document every symptom without investigating causes
To identify underlying causes of a problem so effective corrective action can be developed
To increase final inspection regardless of the problem
To assign responsibility to the person closest to the failure
Which statement best describes the 5 Whys technique?
*
It requires exactly five questions for every problem
It repeatedly asks why to explore a causal chain until a meaningful, actionable cause is reached
It assigns numerical risk ratings to failure modes
It is used only for potential future failures
In FMEA, what does Severity primarily represent?
*
How often a failure occurs
How easily a failure can be detected
The significance of the effect if the failure occurs
The cost of performing the control
In traditional FMEA, a failure mode has Severity = 8, Occurrence = 5, and Detection = 4. What is its RPN?
*
17
80
160
320
Which statement about traditional RPN is most accurate?
*
Every combination producing the same RPN represents identical risk
RPN can help prioritize attention but does not fully describe the nature of risk
RPN eliminates the need to consider Severity separately
RPN is calculated by adding Severity, Occurrence, and Detection
Which Lean tool provides an end-to-end visual representation of material and information flow?
*
5 S
Kanban
Value Stream Mapping
FMEA
Which of the following is an example of Overproduction waste?
*
Producing items before they are required by downstream demand
Walking to retrieve a frequently used tool
Correcting a defective product
Cleaning a work area
Which sequence correctly represents the five stages of 5S?
*
Sort, Set in Order, Shine, Standardize, Sustain
Select, Simplify, Study, Standardize, Sustain
Sort, Schedule, Shine, Stabilize, Sustain
Set in Order, Sort, Standardize, Shine, Sustain
A process has 420 minutes of available production time per day and customer demand of 140 units per day. What is the takt time?
*
2 minutes per unit
3 minutes per unit
4 minutes per unit
6 minutes per unit
What is the fundamental principle of a Kanban pull system?
*
Upstream production is always based on the maximum possible capacity
Downstream demand or consumption triggers upstream replenishment
All inventory must be eliminated immediately
Every process should produce as much as possible before stopping
What is the main purpose of a WIP limit in a Kanban system?
*
To increase the amount of unfinished work in the process
To restrict work in process so flow can improve and excessive queues can be avoided
To replace all process performance measures
To guarantee that every task is completed immediately
Which statement best distinguishes a current-state VSM from a future-state VSM?
*
Current-state maps proposed improvements; future-state maps historical performance
Current-state maps actual present flow; future-state maps a proposed improved flow
Both maps must show exactly the same process conditions
Future-state maps are used only for calculating RPN